- North East
- General Information
- Economy
- Resources
- Agriculture
- Infrastructure
- Tourism
- Industry
- Arunachal Pradesh
- Assam
- General Info
- Districts
- Barpeta
- Bogaigaon
- Baksa
- Cachar
- Chirang
- Darrang
- Dhemaji
- Dhubri
- Dibrugarh
- Dima Hasao
- Goalpara
- Golaghat
- Hailakandi
- Jorhat
- Kamrup
- Kamrup Metro
- Karbi Anglong
- West Karbi Anglong
- Karimganj
- Kokrajhar
- Lakhimpur
- Morigaon
- Nagaon
- Nalbari
- Sivasagar
- Sonitpur
- Tinsukia
- Udalguri
- Biswanath
- Charaideo
- Hojai
- Majuli
- South Salmara
- Tamulpur
- Bajali
- Economy
- Resources
- Agriculture
- Tourism
- Infrastructure
- Industry
- Information Technology
- State Finance
- State Annual Plan
- Manipur
- Meghalaya
- Mizoram
- Nagaland
- Sikkim
- Tripura
- Other Related Sites
Power and Energy
State and Sector-wise Installed Capacity of Power, 2023 and 2024:
State-wise Status of Hydro-Electric Capacity (In terms of Installed Capacity-above 25 MW), 2023 and 2024:
State-wise Per Capita Availability of Power, 2014-15 to 2023-24:
State-wise Availability of Power, 2013-14 to 2023-24:
State-wise Installed Capacity of Power, 2013-14 to 2023-24:
State-wise Power Requirement, 2013-14 to 2023-24:
State-wise Total Installed Capacity of Grid Interactive Renewable Power, 2015 to 2023:
Install Capacity (in MW) of Power Utilizes in North Eastern Region as on 31.03.2025:
Install Capacity (in MW) of Power Utilizes in North Eastern Region as on 30.11.2022:
State-wise Power Supply Position, 2018-19, 2019-2020 and 2024-25:
State-wise cumulative Installed Capacity of Renewable Power, 2023 and 2024:
State-wise cumulative Installed Capacity of Grid Interactive Renewable Power, 2018 and 2019:
State-wise Installed Capacity of Electricity Generation (Utilities), 2023 and 2024:
State-wise Installed Generating Capacity of Electricity (Utilities), 2018 and 2019:
Source-wise and State-wise Estimated Potential of Renewable Power as on 31.03.2024:
Source-wise and State-wise Estimated Potential of Renewable Power, 2019:
Installation of Off-grid / Decentralized Renewable Energy Systems / Devices as on 31.03.2024:
Installation of Off-grid / Decentralised Renewable Energy Systems/ Devices as on 31.12.2019:
State-wise Number of Villages Electrified, 2018 and 2019:
State-wise Details of Hydro Potential including Pumped Storage Potential (Installed Capacity - above 25 MW) as on 30.06.2024:
State and Resource-wise Installed Capacity as on November 2024:
State-wise Forecast of Electrical Energy Requirement and Peak Load at Power Station Bus Bars in NE Region of India, (2010-2011, 2011-2012, 2016-2017 and 2021-2022):
Small Hydro Power projects upto 25 MW Capacity: